Davis Weir |
|
|
Benefits
- Consistent water elevation
- Safety
- Water measurement
- Less labor intensive
- Water conservation
|
|
|
|
|
 |
| |
Davis Weir Before Replacement |
Cofferdam Construction Prior to De-Watering Site |
Rebar and Control Conduit Placement Prior
to Concrete Pour |
|
|
|
 |
| |
Downstream View During Installation
of the Obermeyer Weir |
Upstream View of Water Elevation Control Panels |
Davis Weir After Completion of
Construction |
|
 |
| Drain Outflow Monitoring Project |
|
|
|
 |
| |
Bondurant Slough Drain Outflow Water
Measurement Site |
Willow Creek Outflow Measurement Site |
Drain 55 Outflow Measurement Site |
| |
|
|
| |
Telemetry Installation at Freshwater Check Site |
|
 |
| 2011 Winter Maintenance Project |
|
| |
|
 |
| |
Siphon Replacement - Main Canal Milepost 15.3 |
Silt Accumulation - Main Canal |
|
|
 |
Silt Removal and Bank Sloping - Main Canal |
Exposed Aquatic Weed Growth Damaged by Frost |
Bank Rip-Rap - Main Canal |