GCID Maintenance Projects

Meter Turnout Installation

Meter Turnout Installation

MC-33L Installation

MC-33L Installation

MC-33L Installation

MC-33L Installation

Fabrication of Trash Rack

Fabrication of Trash Rack

Fabrication of ITRC Gate

Fabrication of ITRC Gate

ESC-3 Check 82-25 New Construction

ESC-3 Check 82-25 New Construction

ESC-3 Check 82-25 New Constructionnstru

ESC-3 Check 82-25 New Constructionnstru

Drain Cleaning

Drain Cleaning

Appling Gunite to check replacements 21-2 and 32-2

Appling Gunite to check replacements 21-2 and 32-2

Appling Gunite to check replacements 21-2 and 32-2

Appling Gunite to check replacements 21-2 and 32-2

SCADA Enclosure Fabrication for Tuttle Check

SCADA Enclosure Fabrication for Tuttle Check

SCADA Enclosure Completed for Tuttle CheckSCADA Enclosure Complete for

SCADA Enclosure Completed for Tuttle CheckSCADA Enclosure Complete for

Meter Turnout Installation

Meter Turnout Installation

32-2 Check Replacement

32-2 Check Replacement

2021 January

21-2 Check replacement

21-2 Check replacement

Cortena Pump walkway installation

Cortena Pump walkway installation

Electric trash rack repairs00 Electric trash rack repairs

Electric trash rack repairs

Floating on Main Canal

Floating on Main Canal

Lateral 21-2 STA 137-50 check replacement01_00 Lateral 21-2 STA 137-50 check

Lateral 21-2 STA 137-50 check replacement

Lateral 41-1 erosion and road repairl 41-1 erosion and road

Lateral 41-1 erosion and road repair 41-1 erosion and road

Meter Turnout installation lateral 51-1-21L

Meter Turnout installation lateral 51-1-21L

Spraying on Main Canal

Spraying on Main Canal

Tree pruning on lateral 19-1J

Tree pruning on lateral 19-1J

2020_12

December 2020

Cortena Walkway Progress

December 2020

Cortena Walkway Progress

December 2020

Hydraulic Repairs on CAT Long Reach Excavator

December 2020

Lateral 56-1 Spraying

December 2020

Meter Turnout Installation in WC-2

December 2020

Repairing Check on Lateral 21-2

2020_11

November 2020

Cortina Pump Refurbishment Progress

November 2020

Disking Rodent Damaged Roads

November 2020

Improvements at 51-1

November 2020

Large Breach Repair at MP 20

November 2020

Landowner Damages Caused by Canal Breach at MP 20

November 2020

Installing Meter Turnouts

November 2020

Mechanical Trash Rack Fabrication

November 2020

Silt Removal

November 2020

Small Rodent Hole Repair

2020_10

October 2020

Assisting the City of Willows with Vegetation Control

October 2020

Cleaning Lateral 42-1C-1

October 2020

Cortina Pump Bay Cleanup and Design Measurements

October 2020

Floating in Area 24

October 2020

October 2020

Installing Meter Turnouts

October 2020

Removal of Hunter Creek #3 Weir Panels

October 2020

Subgrade Prep and Form Board Installation at Cortina Pump

2020_09

September 2020

Concrete Pour for Construction of Precast Check Crossings

September 2020

Initial Prep for Cortina Pump Refurbish

September 2020

Crane Operator Class - Practical Exam

September 2020

Fabrication of New Spray Trailer

September 2020

Pre-Overhaul Images of Disassembled 600 HP Pump 4 and 5 Motors

September 2020

Regrading Island Tip

September 2020

Repairing Main Canal Hole

September 2020

Replacing-Repairing Failed Crossing

September 2020

Replacing-Repairing Failed Crossing

September 2020

urvey Stakeout for Post-Dredge Regrading of Northern Montgomery Island

September 2020

urvey Stakeout for Post-Dredge Regrading of Northern Montgomery Island

September 2020

urvey Stakeout for Post-Dredge Regrading of Northern Montgomery Island

September 2020

Walkway Barge

2020_08

August 2020

Repairing Hunter Creek 1 Spill

August 2020

Hole at Hunter Creek 1 Spill

August 2020

Main Canal - RD 16 Drain Repair

August 2020

Main Canal - RD 16 Drain Repair

2020_07

July 2020

Completed Weed Rake for Backhoe

July 2020

Aquatics Removal

July 2020

Cascade Treatment Lateral 21-2

July 2020

Cascade Treatment – Lateral 19-1

July 2020

Construction of Precast Check Crossings

July 2020

Fabrication of Walkway for Pump Station

July 2020

Hauling Dirt from Main Canal to Lateral 21-2

July 2020

Hole Repair

July 2020

Excavator Hydraulic Line Repair

July 2020

Mower Repair

July 2020

Mowing in Area 21

July 2020

Mowing on Lateral 59-1

July 2020

Raising Bank Elevation on Lateral 21-2

July 2020

Raising Bank Elevation on Lateral 21-2

July 2020

Repairing Damaged Lateral Bank

July 2020

Repairing Damaged Lateral Bank

July 2020

Spraying Laterals and Drains

July 2020

Spraying Laterals and Drains

July 2020

Washout Repair B-5 Drain

2020_06

June 2020

Aquatics Removal - Drain C-1

June 2020

Aquatics Removal - Riz Pump Ditch

June 2020

Cascade Treatment

June 2020

Drain Spraying

June 2020

Equipment Shop Projects

June 2020

Equipment Shop Projects

June 2020

Floating and Mowing

June 2020

Floating and Mowing

June 2020

Floating and Mowing

June 2020

Grading Main Canal

June 2020

Hole Repair - 16-4C-2L

June 2020

Hole Repair - Main Canal MP-20

June 2020

Hole repair - H.C-2D

June 2020

Installation of Fish Guidance Booms at Montz Pump

June 2020

Installation of Fish Guidance Booms at Montz Pump

June 2020

Removing Aquatics from Drains

June 2020

Removing Aquatics from Drains

June 2020

Removing Aquatics from Drains

June 2020

Roadway Repair

June 2020

Roadway Repair

June 2020

Roadway Repair

June 2020

Spraying Drains and Laterals

June 2020

Trailer Repairs

June 2020

Weed Rake for Backhoe Fabrication

2020_05

May 2020

Intake Channel Snag Removal

May 2020

Intake Channel Snag Removal

May 2020

Mowing and Spraying

May 2020

Mowing and Spraying

May 2020

Mowing and Spraying

May 2020

Repairing Hole in Lateral 45-1

May 2020

Repairing Holes in 21-1A and B-1 Drain

May 2020

Repairing Holes in 21-1A and B-1 Drain

May 2020

Repairing Track Tensioner

2020_03

March 2020

Cleaning Laterals and Drains

March 2020

Cleaning Laterals and Drains

March 2020

Disking, Floating, Spraying, and Mowing

March 2020

Disking, Floating, Spraying, and Mowing

March 2020

Disking, Floating, Spraying, and Mowing

March 2020

Disking, Floating, Spraying, and Mowing

March 2020

Intake Channel Sediment Removal

March 2020

Intake Channel Sediment Removal

March 2020

Intake Channel Sediment Removal

March 2020

Removing Sediment on the Main Canal at Mile 38 and 44

March 2020

Removing Sediment on the Main Canal at Mile 38 and 44

March 2020

Replacement of 45-1 Check 38+45

March 2020

Willow Creek 3 Crossing and Meter Gate R eplacements

2020_02

February 2020

Backfilling and Prepping for Gunite on 45-1 in Area 26

October 2020

Cortina Pump Bay Cleanup and Design Measurements

February 2020

Backfilling and Prepping for Gunite on 45-1 in Area 26

February 2020

Backfilling and Prepping for Gunite on 45-1 in Area 26

February 2020

Backfilling and Prepping for Gunite on 45-1 in Area 26

February 2020

Building Pre-Cast Board Checks

February 2020

Building the Tip of the Island Back to Design

February 2020

Check Replacement on 45-1 in Area 26

February 2020

Check Replacement on 45-1 in Area 26

February 2020

Floating Main Canal in area 21

February 2020

Installing Fish Guidance Structure at Mouth of Intake Channel

February 2020

Installing Metered Turnouts

February 2020

Installing Metered Turnouts

February 2020

Installing Metered Turnouts

February 2020

Installing Metered Turnouts

February 2020

Installing Metered Turnouts

February 2020

Installing Metered Turnouts

February 2020

Installing Metered Turnouts

February 2020

Mowing Laterals in Area 27

February 2020

New Massey Ferguson Tractor

February 2020

Prepping to Dredge Intake Channel - Hauling in Rock

February 2020

Completed Remodel of the Water Department Office in Shop 5

February 2020

Completed Remodel of the Water Department Office in Shop 5

February 2020

Removing Sediment in the Main Canal at Mile 16 in Area 21

February 2020

Removing Sediment in the Main Canal at Mile 21 in Area 22

February 2020

Removing Sediment in the Main Canal at Mile 24 in Area 23

February 2020

Removing Sediment in the Main Canal at Mile 40 in area 25

February 2020

Repairing Hole on the Main Canal at Mile 14 in Area 21

February 2020

Repairing Hole on the Main Canal at Mile 14 in Area 21

February 2020

Replaced Idler Arm on Excavator 228

February 2020

Replaced Idler Arm on Excavator 228

February 2020

Replaced Idler Arm on Excavator 228

February 2020

Shop Activity

February 2020

Shop Activity

February 2020

Spraying Inside Laterals and Roadways

February 2020

Spraying Inside Laterals and Roadways

February 2020

Spraying Inside Laterals and Roadways

February 2020

eton Treatment in the Main Canal Between Mile 62 and 64

February 2020

Weed Abatement at Pump Station

2020_01

January 2020

Building Additional Space for the Chemical Room

January 2020

Building Additional Space for the Chemical Room

January 2020

Building Precast Single Opening Checks

January 2020

Building Precast Single Opening Checks

January 2020

Cleaning G-2 Drain in Area 27

January 2020

Cleaning G-2G Drain in Area 27

January 2020

Cleaning H-4A Drain in Area 29

January 2020

Fabricating New Slide Panels for 64-1 in Area 29

2020_01_00 Fabricating New Slide Panels

January 2020

Installing Metered Turnouts

January 2020

Installing Metered Turnouts

January 2020

Remodeling the Water Department Office at Willows Shop-5

January 2020

Removing Sediment on 21-1B in Area 22

January 2020

Removing Sediment on the Main Canal in Area 21

January 2020

Removing all Weirs for Winter Maintenance

January 2020

Spraying Pre-Emergent on 41-1 in area 25

GCID

MAILING ADDRESS:

 

P.O. Box 150

Willows, CA 95988

PHYSICAL ADDRESS:

 

344 East Laurel Street

Willows, CA 95988

© 2021 Glenn Colusa Irrigation District – all rights reserved. Reproduction of this site, in whole or in part, in any form or medium without express written permission from GCID is prohibited.
Website designed and maintained by Phil Kline, IT Specialist. Social media posts maintained by Phil Kline, IT Specialist.